| Home • Tips • Tutorials • Forums • Certification Q's • Interview Q's • Jobs • Testimonials • Contact Us | ||
Document Categories:
What's New?
Contribute?Sample SpecsWhat's Hot? |
Automatic IDOC generation whenever a PO is created/changedThis document details about the step-by-step procedure in
generating an IDOC whenever a PO is either created or changed. 1. Go to transaction NACE.
2. Select the row “EF Purchase Order” and click on “Procedures”.
3. From the above screenshot, it is evident that there are 2 procedures for the application EF (Purchase Order). To proceed further, we would need to find out the procedure that is currently active. Go to transaction SPRO. In this, navigate as following: Materials
management à Purchasing à Messages à Output control à Message Determination Schemas à
Define Message Schema for Purchase Order
Click on “Assign Schema to
Purchase Order”.
So, the procedure RMBEF1 is
active for EF (Purchase Order) . 4. Go back to transaction NACE. Select ‘EF’ and click on “Output types”.
5.
Let us use the output type “NEU” for our demonstration purpose.
Double-click on NEU.
6. Ensure that the checkboxes “Access to conditions” and “multiple issuing” are checked.
|
|
|
Please send us your feedback/suggestions at webmaster@SAPTechnical.COM Home • Contribute • About Us • Privacy • Terms Of Use • Disclaimer • Safe • Companies: Advertise on SAPTechnical.COM | Post Job • Contact Us ©2006-2007 SAPTechnical.COM. All rights reserved. All
product names are trademarks of their respective companies. SAPTechnical.COM
is in no way affiliated with SAP AG. Graphic Design by Round the Bend Wizards |
||