| Home • Tips • Tutorials • Forums • Certification Q's • Interview Q's • Jobs • Testimonials • Contact Us | ||
Document Categories:
What's New?
Contribute?Sample SpecsWhat's Hot? |
Automatically filling the field "payment terms" and disable the same while creating PO using the transaction ME22NBy Phani Diwakar, YASH Technologies The
requirement is to capture contract number wise payment terms while creating To add the
contract number in the standard Step1:
Go to transaction CMOD to create the project.
Click on
Create button and provide the meaningful description in the following screen.
Step2:
Now click on’ Enhancement assignments’ button to add the
Step3:
Now click on ‘Component’ button and activate the project.
Double
click on screen ‘0101’. Then it opens screen painter to add the contract
number.
Now open
the Layout editor by click on Layout button. Select the
contract number field from the table EKKO (Add the field contract number to the
structure ‘CI_EKKODB’).
Save and
activate. Step4:
Go back to ‘Flow logic’ and write the following code in POV (Process on
Value-Request) to get the F4 help.
|
|
|
Please send us your feedback/suggestions at webmaster@SAPTechnical.COM Home • Contribute • About Us • Privacy • Terms Of Use • Disclaimer • Safe • Companies: Advertise on SAPTechnical.COM | Post Job • Contact Us ©2006-2007 SAPTechnical.COM. All rights reserved. All
product names are trademarks of their respective companies. SAPTechnical.COM
is in no way affiliated with SAP AG. Graphic Design by Round the Bend Wizards |
||